TELECOMMUNICATION SYSTEMS FOR OFFSHORE FACILITIES – REACH INTEGRATED AWARDED TELECOM SYSTEMS FOR HESS’ CAKERAWALA GAS FIELD

TELECOMMUNICATION SYSTEMS FOR OFFSHORE FACILITIES – REACH INTEGRATED AWARDED TELECOM SYSTEMS FOR HESS’ CAKERAWALA GAS FIELD

Hess Exploration & Production Malaysia B.V. (HESS) is the operator of the Cakerawala Gas Field which is located offshore in the lower part of the Gulf of Thailand approximately 150 km Northeast to Kota Bharu and 160 km East of Narathiwat in water-depth of about 60 meters in contract area of Block A-18 within the Malaysia-Thailand Joint Development Area (MTJDA).

HHA Associates Sdn Bhd (HHA) is the contractor awarded by HESS to undertake the Top-Side Construction and Maintenance Services (TCMS) for CAKERAWALA CKX Booster Compression Platform (BCP).

Under this arrangement, HHA has today awarded Reach Integrated with a contract to upgrade the Explosion Proof CCTV System and Public Address General Alarm (PAGA) System CAKERAWALA CKX Booster Compression Platform (BCP).